![]() Such project implementation occurs while sustaining the exising production rate. Likewise, for Airbus, ECA Group was missioned to redesign the A320 PreFAL in order to meet customers' production ramp up. They include electrical or hydraulic lifting devices for assembly by measure using laser tracker handling tools mechanical gantries multi-axis robots drilling and riveting tools access platform transportation tool including automated guided vehicles (AGV).ĮCA Group solutions ensure productivity improvement and better production cycles while preserving workers safety and investment cost optimisation.ĮCA Group supplied the new ATR FAL full assembly station and construction tooling as well as all associated electronics testing means and mechanical GSE. ![]() ![]() ECA Group supplies and installs on-site turnkey project, till commissioning phase.Īs project integrator, we manage the supply chain to deliver specific innovative solutions. ECA Group integrates assembly lines, from design to turnkey project delivery, for aircraft FAL, Pre-FAL, aerostructure and aerospace equipment.ĮCA Group masters assembly station development and building in the aerospace industrial environment through analysis, design and production optimisation processes tusing lean manufacturing principles, flow automation and ergonomic jigs & tools. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |